the processlisted below are the 4 stages of the client order proces
1. Consultation and Client Order CreationA meeting will be arranged between the client and a representative of UrbanVelvet Ltd. To discuss the issues involved in the development of the clients web site. After the consultation, a document will be drawn up (Client Order) outlining the development of the web site and breakdown of the costs involved. This document will list the number of pages required including extra coding and any hosting costs if applicable. I rough guide to time scales will also be included in this document. Any amendments to this document must be put forward by the client and a new document drawn up.
2. Issuing of Invoice and Initail DepositAfter completion of stage 1, UrbanVelvet will commence the Client Order Process. For orders under £1000.00 an initial deposit of 50% will be required.
3. Web Development and Beta Pages UploadedUrbanVelvet Ltd. will design and create the ‘Beta Pages’ and make available online for the client to inspect. These pages are intended to represent the final web site in layout and design. Changes can be made to the layout at this point upon agreement of both the client and UrbanVelvet Ltd.
4. Final Pages UploadedAfter agreement has been reached the ‘Final Pages’ will be uploaded to the arranged URL and the web site will be deemed ‘Live’.
Additional DevelopmentAfter the web site is deemed ‘Live’, any addition work will fall outside this client agreement and a new client agreement must be created with new costs and time frames.
|
|

